Mapping Analysis of Active Fire Protection System on Dormitory Building in X University

7 Halaman

Penulis

, , ,

ISSN

2540-7872

Penerbit

Faculty of Public Health, Universitas Airlangga, and supported by Indonesian Occupational Safety and Health Association (AHKKI) East Java Region, Indonesian Occupational Health Experts Association (PAKKI), and Indonesian Industrial Hygiene Association.

Diterbitkan pada

31/05/2021

Bahasa

English

Kata Kunci

, ,

Abstrak

Introduction: Fire cases increase in residential buildings due to short circuits, with dormitories being mostly affected by human factors. X University dormitory building is a place for 24 hours of students’ activities, characterized by high electricity consumption, bad behavior such as overpowering extensions, and many flammable objects like paper and furniture. The research objectives are to investigate the appropriateness and map the needs of fire protection systems in accordance with regulations. Methods: The research is a semi-quantitative analysis. Primary data were collected through observations using a checklist form that refers to the regulations and the results of managers' interviews. The obtained data are categorized into three levels: good with suitability >79-100%, moderate ≥60%-79%, and poor <60%. Result: The appropriateness of the active fire protection system is under 60% or in the poor category. The appropriateness of specific components is as follows: fire extinguishers at 47.77%, hydrants at 58.75%, alarms at 18.75%, and heat detectors at 35.90%. There is no sprinkler installation in the dormitory building, and no commitment from top management regarding occupational safety and health. The need for fire extinguishers is 10 units per floor; the number of hydrants has been fulfilled; an additional alarm unit is required on each floor; and a total of 114 heat detectors is needed. Conclusion: The active fire protection system is still under 60% (poor category) and lacks maintenance. Based on the aforementioned mapping results, there is a need to add the number of pieces of equipment according to the regulations and to implement maintenance efforts.

Kata Mereka

Testimoni Pengguna M3

Lebih Banyak