Analysis of The Application of BIM 5d in the Calculation of Quantity Take Off (QTO) for Construction Architecture Multi-Story Buildings
6 Halaman
Penulis
ISSN
2407-9103
Penerbit
Politeknik Negeri Jakarta , Indonesia
Diterbitkan pada
31/01/2025
Bahasa
English
DOI
-Kata Kunci
Abstrak
Digital construction technology that is able to have an impact on infrastructure development so that it becomes more efficient and productive, one of which is Building Information Modeling (BIM). As stated in the Regulation of the Minister of Public Works and Public Housing (PUPR), currently the use of Building Information Modeling (BIM) technology is limited to state buildings with an area of over 2000 m2 and above 2 floors as stated in the Minister of PUPR Regulation No. 22 of 2018 regarding the Construction of State Buildings so that the X Head Office Construction Project which has a total area of 11,992.62 is required to apply the BIM method in its implementation. Quantity take Off is one of the things that can determine success, with BIM-based software Glodon Cubicost being able to model 3D buildings which will then directly get the project quantity of material requirements. From the comparative analysis, it was found that the difference in quantity was 12.23% for wall work, 3.9% for floor finishing work, 9.3% for ceiling work and 0% or no difference at all for door and window work. And the findings of the factors causing the difference are Calculation Policy, Size and notation description, Mastery of software / applications and Accuracy in calculating quantity.
